Desiminasi Sistem Pembangkit Tenaga Surya untuk Guru dan Siswa di Kabupaten Bandung

Authors

  • Bandiyah Sri Aprillia TELKOM UNIVERSITY
    Indonesia
  • Mohamad Ramdhani Telkom University
    Indonesia
  • Irwan Purnama Telkom University
    Indonesia

DOI:

https://doi.org/10.23917/warta.v26i2.1016

Keywords:

solar power plant installation, solar energy, on-grid solar power plant.

Abstract

Utilization of solar energy requires an active role from the community by providing information related to solar energy and the potential that can be obtainedIt is necessary to provide guidance to the community by providing basic knowledge about the conversion of solar energy into electricity. Followed by doing practice in proving the basic knowledge given in the form of simple practice. So that the public can understand information related to solar energy as a whole, both basic knowledge, conversion techniques, and installation techniques. The purpose of this community service is to provide training on solar power plant installations as a learning medium in the use of renewable energy in the form of solar energy. The training targets are MA teachers and students as the next generation who in the future will face greater challenges related to energy utilization. MA students are currently required to be more creative and innovative in utilizing all the potential of nature, especially the use of alternative technologies, one of which is solar energy. The Pangalengan area is also a challenge in itself in the use of electricity technology for the need for support by using solar energy for electricity use. In the community service program, an On-Grid 260 Wp solar power plant system has been installed which aims as a learning medium and helps reduce monthly school costs by integrating solar panels for the electrification of the Natural Sciences Laboratory (IPA).

References

Aji, E.P., Wibowo, P., & Windarta, J. (2022). Kinerja Pembangkit Listrik Tenaga Surya (PLTS) dengan Sistem On Grid di BPR BKK Mandiraja Cabang Wanayasa Kabupaten Banjarnegara. Jurnal Energi Baru & Terbarukan 03001:1-13.

Alim, A., Abdillah, H., Ramdani, S.D. (2022). Analisis Perbandingan Daya Keluaran Modul Solar Cell 50 WP Reflector Cermin Datar. Vocational Education National Seminar 1(1), 110-115.

Aprillia, B. S., Ekaputri, C., & Fahmi, M. R. Z. (2020, March). Solar Cell Output Optimization using Light Convergence Method. In IOP Conference Series: Materials Science and Engineering (Vol. 771, No. 1, p. 012010). IOP Publishing.

Barri, M. H., Aprillia, B. S., Sugiana, A., & Adam, K. B. (2021). Integrasi Modul Energi Surya untuk Membantu Sistem Kelistrikan di Pondok Pesantren Darul Bayan Kecamatan Jatinangor Kabupaten Bandung. J-Dinamika: Jurnal Pengabdian Masyarakat, 6(1), 117-122.

Berawi, M.A., Miraj, P., Sayuti, M.S., Berawi, A.R.R. (2017). Improving building performance using smart building concept Benefit cost ratio. AIP Proceeding 03001:1-6.

Rinaldi, R., Aprillia, B. S., Ekaputri, C., & Reza, M. (2020). Design of Open Loop Single Axis Solar Tracker System. Paper presented at the IOP Conference Series: Materials Science and Engineering.

Handayani, N. A., & Ariyanti, D. (2012). Potency of Solar Energy Applications in Indonesia. International Journal of Renewable Energy Development, 1(2), 33–38.

Harahap, P., Adam, M., & Balisranislam, B. (2021). Implementasi Trainer Kit Pembangkit Listrik Tenaga Surya sebagai Pengembangan Media Pembelajaran Instalasi Listrik. ABDI SABHA (Jurnal Pengabdian kepada Masyarakat), 2(2), 198-205.

Kaban, S. A., Jafri, M., & Gusnawati. (2020).Optimalisasi Penerimaan Intensitas Cahaya Matahari Pada Permukaan Panel Surya (Solar Cell) Menggunakan Cermin. Jurnal Fisika, 5(2), 108–117.

Kementerian Energi dan Sumber Daya Mineral. (2020). Panduan Perencanaan dan Pemanfaatan PLTS atap di Indonesia.

Khaffi, A., Idris, A. R., & Sofyan, S. (2020, October). Rancang Bangun Modul Trainer Pembangkit Listrik Tenaga Surya (PLTS). In Seminar Nasional Teknik Elektro dan Informatika (SNTEI) (pp. 15-21).

McNeil, M. A., Karali, N., & Letschert, V. (2019). Forecasting Indonesia’s electricity load through 2030 and peak demand reductions from appliance and lighting efficiency. Energy for Sustainable Development, 49, 65–77.

Santoso, G., dkk. (2021). Pemanfaatan Pembangkit Listrik Tenaga Surya Sebagai Sumber Energi Listrik Cadangan Budidaya Burung Puyuh Dilengkapi Dengan Automatic Transfer Switch (ATS). Jurnal Elektrikal, Volume 8 No. 2 : 45-52.

Tim Sekretaris Jenderal Dewan Energi Nasional. (2019). Outlook Energi Indonesia 2019. Kementrian ESDM

Yuwono, Budi. (2005). Skripsi Optimalisasi Panel Sel Surya Dengan Menggunakan Sistem Pelacak Berbasis Mikrokontroler AT89C51. 2(3), 12-20.

Downloads

Submitted

29-07-2022

Accepted

15-02-2023

Published

01-04-2023

How to Cite

Aprillia, B. S., Mohamad Ramdhani, & Irwan Purnama. (2023). Desiminasi Sistem Pembangkit Tenaga Surya untuk Guru dan Siswa di Kabupaten Bandung. Warta LPM, 26(2), 166–173. https://doi.org/10.23917/warta.v26i2.1016