[1]
Wijaya, B. et al. 2025. Analysis of the coal and white leadtree wood co-firing needs as a primary fuel source in the anggrek gorontalo coal-steam electricity power plant (PLTU). Emitor: Jurnal Teknik Elektro. 25, 1 (Mar. 2025), 39–46. DOI:https://doi.org/10.23917/emitor.v25i1.8758.